爆破拆除的铁四院前大楼为砖混外套框架的"楼包楼"特殊结构,周边环境复杂。为确定合理的爆破拆除方案和爆破参数,控制其倒塌姿态和爆堆范围,利用ANSYS/LS-DYNA有限元软件,建立分离式耦合模型,对多个拆除爆破方案进行模拟分析,确定了单向折叠爆破方案,并对折叠爆破方案中的切口起爆时差,立柱破坏部位,立柱爆高等参数进行优化,其中上下切口起爆时差调整为1020 ms,中间与两侧时差为880 ms,后排支撑区立柱实施松动爆破,同时提高上切口立柱爆破高度。采用优化方案,建筑物被成功爆破,结构折叠形态明显,爆破效果理想。实际爆破结果表明,爆破切口的形成和闭合、结构倒塌过程、塌落范围与形态等与模拟结果基本一致。
关键词(KeyWords): 框架结构;爆破拆除;数值模拟;方案优化
基金项目(Foundation):
作者(Author): 蒙云琪,倪明亮,操鹏,王宇,李小贝,孙金山,张兆龙
参考文献(References):
- [1]汪旭光.爆破设计与施工[M].北京:冶金工业出版社,2011:201-203.
- [2]谢先启,刘军,贾永胜,等.拆除爆破数值模拟研究进展[J].中国工程科学,2014,16(11):20-27.[2]XIE Xian-qi,LIU Jun,JIA Yong-sheng,et al.Progress in numerical simulation of demolition blasting[J].Engineering Sciences,2014,16(11):20-27.(in Chinese)
- [3]谢先启,贾永胜,姚颖康,等.复杂环境下城市超长高架桥精细爆破拆除关键技术研究[J].中国工程科学,2014,16(11):65-71.[3]XIE Xian-qi,JIA Yong-sheng,YAO Ying-kang,et al.Research on key technology of fine blasting demolition of urban super long viaduct in complicated environment[J].Engineering Sciences,2014,16(11):65-71.(in Chinese)
- [4]GB 6722—2014爆破安全规程[S].北京:中国标准出版社,2014.[4]GB 6722—2014 Safety regulations for blasting[S].Beijing:Standards Press of China,2014.(in Chinese)
- [5]李清,杨阳,杨仁树,等.基于MAT96本构模型的钢筋混凝土结构爆破拆除数值模拟[J].爆破器材,2015,44(1):41-45.[5]LI Qing,YANG Yang,YANG Ren-shu.Numerical simulation of blasting demolition of reinforced concrete structures based on MAT96 constitutive model[J].Explosive Materials,2015,44(1):41-45.(in Chinese)
- [6]季杉,王桂玲,谢伟平.高架桥爆破坍塌全过程数值模拟与分析[J].爆破,2014,31(4):76-81.[6]JI Shan,WANG Gui-ling,XIE Wei-ping.Analysis and numerical simulation of whole process of blasting and collapse of viaduct[J].Blasting,2014,31(4):76-81.(in Chinese)
- [7]费鸿禄,杨小庚,周健华,等.18层框架楼房定向爆破倒塌迟缓原因分析[J].爆破,2017,34(4):149-174.[7]FEI Hong-lu,YANG Xiao-geng,ZHOU Jian-hua,et al.Analysis of collapse delay causes of directional explosive demolition in 18 layers frame buildings[J].Blasting,2017,34(4):149-174.(in Chinese)
- [8]谢先启,贾永胜,黄小物,等.17层框-剪结构大楼定向爆破拆除[J].爆破,2016,33(2):107-112.[8]XIE Xian-qi,JIA Yong-sheng,HUANG Xiao-wu,et al.Directional explosive demolition of 17-layer frame-shear structure building[J].Blasting,2016,33(2):107-112.(in Chinese)
- [9]费鸿禄,刘梦,张玉莹,等.10层框架结构楼房爆破拆除的数值模拟[J].工程爆破,2016,22(3):48-53.[9]FEI Hong-lu,LIU Meng,ZHANG Yu-ying,et al.Numerical simulation of blasting demolition of 10-storey frame structure building[J].Engineering Blasting,2016,22(3):48-53.(in Chinese)
- [10]崔正荣,赵翔.框架楼房原地坍塌爆破拆除模拟与优化[J].爆破,2014,31(2):100-103.[10]CUI Zheng-rong,ZHAO Xiang.Simulation and optimization of explosive demolition of frame structure collapse in situ[J].Blasting,2014,31(2):100-103.(in Chinese)
- [11]刘毅,易书林.建筑物爆破拆除定向切口参量数值模拟研究[J].现代电子技术,2016,39(17):156-160.[11]LIU Yi,YI Shu-lin.Study on numerical simulation of directional incision parameter for building blasting demolition[J].Modern Electronics Technique,2016,39(17):156-160.(in Chinese)
- [12]Livermore Software Technology Corporation.LS-DYNA Keyword User's Manual.Version R9.0[M].Livermore Software Technology Corporation,2016.
- [13]孙金山,谢先启,王坤鹏,等.建(构)筑物墩柱爆破后裸露钢筋初弯曲失稳模型[J].爆破,2015,32(1):1-4.[13]SUN Jin-shan,XIE Xian-qi,WANG Kun-peng,et al.Initial bending instability model of exposed reinforcing bars in demolition projects[J].Blasting,2015,32(1):1-4.(in Chinese)