小高宽比框架结构爆破拆除数值模拟研究Study on Blasting Demolition of Frame Structure with Small Height-width Ratio by Numerical Simulation
高文乐,王燕萍,李琛豪,张建伟,李赛江
摘要(Abstract):
为研究小高宽比框架结构爆破拆除的倒塌过程,利用ANSYS/LS-DYNA有限元软件建立分离式共节点模型,对其倒塌过程进行数值模拟研究,分析该结构钢筋混凝土柱的受力特点。通过对比实际工程与模拟结果,发现两者在倒塌时间、倒塌历程、爆堆范围等方面高度一致,由此可见数值模拟是可靠的。研究发现:在倒塌过程中,各排立柱达到截面抵抗弯矩后会在梁柱节点处产生塑性铰,上部结构以塑性铰作定轴转动,前倾过程中对后排立柱产生向后的反力,以致产生明显的后坐。倒塌前期钢筋与混凝土单元共同受力,混凝土单元失效后,与其共节点的钢筋单元应力发生突变,随后在拉压状态下不断变换,直至倒塌结束,爆破切口处的钢筋对上部结构的自由落体有一定的阻碍作用。
关键词(KeyWords): 楼房爆破拆除;小高宽比;分离式共节点;数值模拟
基金项目(Foundation): 国家自然科学基金项目(51874189)~~
作者(Author): 高文乐,王燕萍,李琛豪,张建伟,李赛江
参考文献(References):
- [1] 贾永胜,谢先启,姚颖康,等.高层建筑物折叠爆破拆除关键技术参数探讨[J].爆破,2016,33(3):75- 80,131.[1] JIA Yong-sheng,XIE Xian-qi,YAO Ying-kang,et al.Discussed on key parameters of folding explosive demolition of high high-rise building[J].Blasting,2016,33(3):75- 80,131.(in Chinese)
- [2] 谢先启.拆除爆破技术的发展与展望[J].爆破,2019,36(2):1-12.[2] XIE Xian-qi.Development situation and trend of demolition blasting technology[J].Blasting,2019,36(2):1-12.(in Chinese)
- [3] 李胜林,王宇涛,黄明升,等.单榀钢混框架结构内爆法拆除模拟[J].北京理工大学学报,2012,32(4):354-357,385.DOI:10.15918/j.tbit1001- 0645.2012.04.019.[3] LI Sheng-lin,WANG Yu-tao,HUANG Ming-sheng,at al.Numerical simulation of single concrete framework implosion demolition[J].Transactions of Beijing Institute of Technology,2012,32(4):354-357,385.DOL:10.15918/j.tbit1001- 0645.2012.04.019.(in Chinese)
- [4] 高文乐,张泽华,苏凯凯,等.多截面承重立柱酒店定向拆除爆破[J].工程爆破,2018,24(2):59- 65.[4] GAO Wen-le,ZHANG Ze-hua,SU Kai-kai,at al.Directional blasting demolition of hotel with multi-section bearing colum[J].Engineering Blasting,2018,24(2):59- 65.(in Chinese)
- [5] 费鸿禄,周健华,王高山.内含解毒塔的不对称框架结构解毒房的定向爆破拆除[J].爆破器材,2016,45(6):44-50,56.[5] FEI Hong-lu,ZHOU Jian-hua,WANG Gao-shan.Directional blasting demolition of a detoxification house with asymmetric frame structure containing a detoxification tower[J].Explosive Materials,2016,45(6):44-50,56.(in Chinese)
- [6] 叶海旺,李庆,郑长青,等.22层框架楼房定向爆破拆除倒塌过程分析[J].爆破,2021,38(2):111-117.[6] YE Hai-wang,LI Qing,ZHENG Chang-qing,at al.Analysis on collapse process of 22 storey frame building demolished by directional blasting[J].Blasting,2021,38(2):111-117.(in Chinese)
- [7] 泮红星.52 m高喷煤车间定向爆破拆除[J].工程爆破,2019,25(1):45-50.[7] PAN Hong-xing.The directional blasting of 52-meter-high pulverized coal workshop[J].Engineering Blasting,2019,25(1):45-50.(in Chinese)
- [8] 于明亮.框架结构建筑物爆破拆除在不同起爆分区条件下动荷载研究[D].湘潭:湖南科技大学,2017.[8] YU Ming-liang.Study on dynamic load of blasting demolition of frame structures under different blasting partitions[D].Xiangtan:Hunan University of Science and Technology,2017.(in Chinese)
- [9] 刘伟,叶家明,胡彬,等.高强度钢筋混凝土结构楼房拆除爆破及数值模拟[J].安徽理工大学学报(自然科学版),2020,40(2):19-27.[9] LIU Wei,YE Jia-ming,HU Bin,at al.Study on demolition blasting of high strength reinforced concrete structure building and its numerical simulation[J].Journal of Anhui University of Science and Technology(Natural Science),2020,40(2):19-27.(in Chinese)
- [10] 罗伟,王明明,刘治兵.11层框架结构楼房爆破拆除[J].煤矿爆破,2020,38(4):34-38.[10] LUO Wei,WANG Ming-ming,LIU Zhi-bing.Blasting demolition of 11 storey frame structure building[J].Coal Mine Blasting,2020,38(4):34-38.(in Chinese)
- [11] 谢钱斌.内部结构复杂的高层楼房拆除爆破[J].工程爆破,2019,25(5):52-56,62.[11] XIE Qian-bin.Demolition blasting of high-storey buildings with complex internal structure[J].Engineering Blasting,2019,25(5):52-56,62.(in Chinese)
- [12] ZHOU Xiao-guang .Simulation calculation of the collapse process of high-rise steel structure energy-forming cutting blasting demolition[J].Wireless Communications and Mobile Computing,2022,2022:3735006.
- [13] SUN Jin-shan ,JIA Yong-sheng ,XIE Xian-qi ,at al.Design criteria for the folding implosion of high-rise RC buildings[J].Engineering Structures,2021,233(4):111933.
- [14] 李清,杨阳,杨仁树,等.基于MAT96本构模型的钢筋混凝土结构爆破拆除数值模拟[J].爆破器材,2015,44(1):41- 45.[14] LI Qing,YANG Yang,YANG Ren-shu,at al.The numerical simulation of reinforced concrete structure blasting based on MAT96 constitutive model[J].Explosive Materials,2015,44(1):41- 45.(in Chinese)
- [15] 汪旭光,于亚伦.爆破拆除理论与工程实例[M].北京:人民交通出版社,2008.[15] WANG Xu-guang,YU Ya-lun.Blasting demolition theory and engineering example[M].Beijing:China Communications Press,2008.(in Chinese)
- [16] 高文乐,李元振,赵德龙,等.多截面承重立柱框架结构爆破拆除数值模拟研究[J].爆破,2021,38(1):93-99.[16] GAO Wen-le,LI Yuan-zhen,ZHAO De-long,at al.Numerical simulation on blasting demolition of multi-section load-bearing column frame structure[J].Blasting,2021,38(1):93-99.(in Chinese)
- [17] 姚颖康,谢先启,孙金山,等.钢筋混凝土立柱爆破后钢筋骨架承载特征研究[J].爆破,2017,34(4):1- 6,16,185.[17] YAO Ying-kang,XIE Xian-qi,SUN Jin-shan,at al.Bearing characteristics of reinforcement steel cage after reinforced concrete pillar blasting[J].Blasting,2017,34(4):1- 6,16,185.(in Chinese)
- [18] 崔晓荣,郑炳旭,魏晓林,等.建筑爆破倒塌过程的摄影测量分析(Ⅰ)—运动过程分析[J].工程爆破,2007(3):8-13,17.[18] CUI Xiao-rong,ZHENG Bing-xu,WEI Xiao-lin,at al.Close- range photogrammetry analysis of building-collapse(i)—movement of building during bl asting demolition[J].Engineering Blasting,2007(3):8-13,17.(in Chinese)